Apply for MEPCO New Connection

A comprehensive guide on the official ENC portal application process, demand notice fees and document requirements for 2026.

The 4-Step New Connection Process

The Ministry of Energy limits all DISCOs (including MEPCO) to a standardized digital process. To get your new meter installed efficiently, strictly follow these four visual steps.

Digital ENC Process Workflow

1. Apply Online

Fill out the application form on the official ENC website carefully. Select MEPCO as your company.

2. Submit Documents

Upload scanned copies of property documents, CNIC and an oath commissioner's affidavit.

3. Demand Notice

MEPCO surveys the site and issues a Demand Notice to be paid at a designated bank.

4. Installation

Submit the paid Demand Notice receipt. MEPCO installs the meter within 30 days.


Documents Required for a New Meter

Before you begin your application make sure you have scanned copies of the following documents. Each document should be no bigger, than 300KB.

Personal ID

  • Applicant's CNIC (Front and Back)
  • Copy of witnessing neighbor's CNIC (2 witnesses required)

Property Proof

  • Property Registry, Allotment Letter or Fard
  • In case of a tenant: NOC from owner + Rent Agreement

How to Track Your Application Status

When you click submit the ENC system will give you a Tracking ID. Here's how to check where your application is, in the queue:

  1. Go to the official ENC tracking portal: enc.com.pk (Track section)
  2. Select MEPCO from the DISCO dropdown.
  3. Choose New Connection as the application type.
  4. Enter your Tracking ID or CNIC number and click Check.
  5. The system will display whether your application is pending survey, pending Demand Notice payment or pending installation.

๐Ÿ’ก Pro Tip: Need a duplicate Demand Notice?

If you misplace your Demand Notice, you can reprint it via the ENC portal by using your Tracking ID. You cannot pay it online โ€” it must be paid over the counter at the banks specified on the printout (usually designated NBP or BOP branches).

New Connection FAQs

Here are the answers to some questions about the MEPCO new meter application process.

The answer is that it takes around 30 to 45 days from the date you apply for the MEPCO connection to the day the MEPCO meter is actually installed.

A Demand Notice is a payment voucher issued by MEPCO for the cost of wire, meter and service line. You must pay this at a designated commercial bank (usually NBP, HBL or BOP) mentioned on the notice. You cannot pay your demand notice online now.

Yes you can use the ENC portal for Domestic, Commercial, Industrial and Agricultural MEPCO connections. If you need a high-load industrial MEPCO connection, which is more than 15kW you will need to give some extra documents like a site map and details about your load.

If your MEPCO application status has not changed for than 45 days you should go to the MEPCO Division or Sub-division office for your area, with your Tracking ID. You can also call the MEPCO helpline at 061-9210334.

About This Guide

Verified Content
๐Ÿ‘ค
MEPCOBILLONLINE.COM Editorial Team
Consumer Utility Researchers, South Punjab

Our team of consumer utility researchers based in Multan has been monitoring MEPCO billing systems, NEPRA tariff changes and consumer rights since 2020. All information on this site is cross-checked against official MEPCO, PITC and NEPRA sources before publication.

Sources: mepco.com.pk ยท PITC
๐Ÿ“Œ Transparency Notice: MepcoBillOnline.Com is an independent, unofficial service. We are not affiliated with MEPCO, PITC or the Government of Pakistan. For data usage details or support, please review our Privacy Policy or contact us.